This site uses cookies to enhance navigation. If you continue with your visit, you accept the use of cookies and privacy policy. Accept

  • Renewable
    generation company
    Barbo Renewables manages and operates
    40 small hydropower plants
    selling the energy in the spanish wholesale market
  • 40 hydropower
    plants
    Including 55 turbine-generator groups
    and 33,65 MW total installed power
  • 33,65 MW
    generation capacity
    Enough to supply a 40.000 people town

Key figures

40

Hydropower plants

And a combined installed generation capacity of 33,65 MW

10

Concession agreements

Managed from our Bilbao and Murcia offices

52

Turbine-generator groups

Producing enough energy for a 40.000 people town

33

Water dams

Including 58 Km of channels, 4.863 meters penstock, 446 m3/s waterflow and 1.561 meter head


Centralized control room for remote monitoring and management of all generation assets

Production figures

Generation capacity

Enough to supply 40.000 people town

Enviromental impact

Equivalent to 10.000 tree forest, saving more than 2.500 tonns of oil equivalent (TOE) import

Electricity sale

Sale of electricity in the wholesale spanish electric market as a generator

Main assets

Below a selected list of some of some of our generation assets

  • Ábarán hydropower plant

    Location: Abarán, Murcia, Spain
    Opening year: 1.925
    Segura river
    2 turbine-generator groups
    810 KW generation power
    1 main building and 1 workshop
    1 dam
    310 meter long and 8,5x2,5 m2 section channel
    24 m3/s watterflow
    4,6 meter head

  • Batanejos hydropower plant

    Location: Villagordo del Júcar, Albacete, Spain
    Opening year: 1.920
    Júcar river
    1 turbine-generator group
    749 KW generation power
    Main building and attached workshop
    1 dam
    400 meter lenght and 10x4 m2 section channel
    14,57 m3/s waterflow

  •  Chorro del Duque hydropower plant

    Location: Solana de Avila, Avila
    Operning year: 1.910
    Collects water from Duque lagoon
    1 turbine-generator group
    1.020 KW generation power
    Main building and housing
    1.003 meter penstock
    0,9 m3/s waterflow
    212,2 meter head

  •  Gallipienzo hydropower plant

    Location: Gallipienzo, Navarra, Spain
    Opening year: 1.985 (original mill from 1687)
    Aragón river
    2 turbine-generator groups
    1.400 KW generation power
    Main building
    1 Dam
    50 meter lenght and 21x4 m2 section channel
    40 m3/s waterflow
    3,3 mts head

  •  Moranchel hydropower plant

    Location: Jorquera, Albacete, Spain 
    Opening year: 1.943
    Júcar river
    2 trubine-generator groups
    2.920 KW generation power
    Mai building
    1 dam
    560 meter lenght and 8x3 m2 section channel
    20 m3/s waterflow
    13,78 meter head

  •  Recueja hydropower plant

    Location: Recueja, Albacete, Spain
    Opening year: 1.921
    Júcar river
    2 turbine-generator groups
    3440 KW generation power
    1 Main building
    1 Dam
    2800 meter lenght and 8x3 m2 section channel
    24 m3/s waterflow
    11,74 meter head

  •  Solvente hydropower plant

    Location: Solvente, Murcia, Spain
    Operning year: 1.930
    Segura river
    2 turbine-generator groups
    2940 KW generation power
    1 main building
    1 dam
    756 meter lenght and 6x3 m2 section channel
    25 m3/s waterflow
    13,94 meter head

  • Ulea hydropower plant

    Loaction: Ulea, Murcia, Spain 
    Opening year: 1.959
    Segura river
    1 turbine-generator group
    1600 KW generation power
    1 main building
    1 dam
    1910 meter lenght and 4x3 m2 section channel
    86 meter penstock
    22 m3/s waterflow
    9,4 mts head

  • Yanci II hydropower plant

    Location: Igantzi, Navarra, Spain 
    Operning year: 1.913
    Latsa river
    2 turbine-generator groups
    560 KW generation power
    1 main building
    1 dam
    5.500 meter length and 1,8x1,6 m2 section channel
    350 meter penstock
    1,2 m3/s waterflow
    74 meter head

  • Zaburdon hydropower plant

    Location: Solana de Avila, Avila, Spain 
    Opening year: 1.910
    Collects water from Duque and Trampal lagoon
    1 turbine-generator group
    1.002 KW generation power
    1 main building and attached housing
    1 dam
    1.715 meter lenght and 1,2x1,2 m2 section channel
    714 meter penstock
    0,9 m3/s waterflow
    157,7 mts head